Last modified: 25 Sep 2019 09:58
Course provides a detailed understanding of the techniques used for installation, inspection, and maintenance of subsea systems, including seabed hardware, pipelines and risers, and the implications of such techniques for the design of subsea components and systems.
The module will provide detailed knowledge on various techniques and trends in the installation, inspection and maintenance of subsea equipment, especially pipeline and riser systems and principal components. It will provide engineers with a sufficiently broad awareness of techniques used throughout offshore operations to give an appreciation and understanding of system limitations and appropriate applications for different subsea environments
Study Type | Postgraduate | Level | 5 |
---|---|---|---|
Term | First Term | Credit Points | 15 credits (7.5 ECTS credits) |
Campus | Aberdeen | Sustained Study | No |
Co-ordinators |
|
Design and installation planning.
Vessel types.
Spool designs.
Principles of rig set-up and operation.
Subsea installation (including operational and installation loads).
Lifting analysis and calculation.
ROV Diving and diverless intervention and Tooling systems.
Subsea well access.
Deep water subsea installation techniques.
Subsea Inspection.
Survey and understanding spatial/acoustic positioning methods and accuracy.
Information on contact teaching time is available from the course guide.
Assessment Type | Summative | Weighting | 20 | |
---|---|---|---|---|
Assessment Weeks | Feedback Weeks | |||
Feedback |
Online Multiple Choice Questions. Feedback via MyAberdeen. |
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
Assessment Type | Summative | Weighting | 25 | |
---|---|---|---|---|
Assessment Weeks | Feedback Weeks | |||
Feedback |
Lifting Exercise by Orcaflex, including finding tensions at slings. |
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
Assessment Type | Summative | Weighting | 25 | |
---|---|---|---|---|
Assessment Weeks | Feedback Weeks | |||
Feedback |
Rigid Pipe Lay exercise, including finding installation stress. Feedback via MyAberdeen. |
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
Assessment Type | Summative | Weighting | 30 | |
---|---|---|---|---|
Assessment Weeks | Feedback Weeks | |||
Feedback |
Subsea Spool Metrology, including finding spool dimensions. Feedback via MyAberdeen. |
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
There are no assessments for this course.
Assessment Type | Summative | Weighting | ||
---|---|---|---|---|
Assessment Weeks | Feedback Weeks | |||
Feedback |
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
Knowledge Level | Thinking Skill | Outcome |
---|---|---|
|
We have detected that you are have compatibility mode enabled or are using an old version of Internet Explorer. You either need to switch off compatibility mode for this site or upgrade your browser.